This state-of-the-art childcare facility delivers 2,594m² of purpose-built space at ground level, supported by a basement and three upper levels now completed to a full internal fitout. Works included 800m² of partitioned walls and 1,200m² of set plaster suspended ceilings, all delivered to an exceptional standard.
Featuring a commercial kitchen, laundry, change rooms, restrooms, office spaces, reception and dedicated play amenities, this purpose-built facility has been fully completed to deliver an exceptional experience for children and educators. The project also includes extensive landscaping across the outdoor areas, creating a safe, engaging and thoughtfully designed environment.
| Client | Holder East |
|---|---|
| Architect | Point Architects |
| Address | 397 Blackburn Road, Burwood East, Wurundjeri |
| Sector | Education |
| Services | Design & Construct |
| Duration | February 2024 – September 2025 |
Scope of Work
- Bulk excavation of approximately 2,900m2
- 16 bored piers supporting the vertical load
- 136 retention piles bordering the 120 linear meter perimeter
- 10,000L below ground rainwater tank
- 2,000L grease trap
- Approximately 800m2 of concrete to be poured, forming the footings, lift base columns, and beams to slab on ground all the way through to Level Two with a post tensioned suspended slab
- 42 AFS panels spanning approximately 400m2 forming the lift core, stairs, and internal structural walls
- Seven tonnes of structural steel providing framing for the canopy and lightweight steel truss roof